{"id":4882,"date":"2025-08-03T13:04:10","date_gmt":"2025-08-03T09:34:10","guid":{"rendered":"https:\/\/lanizco.com\/projects\/tabiat-bridge\/"},"modified":"2025-08-03T14:30:02","modified_gmt":"2025-08-03T11:00:02","slug":"tabiat-bridge","status":"publish","type":"projects","link":"https:\/\/lanizco.com\/en\/projects\/tabiat-bridge\/","title":{"rendered":"Alborz Tunnel"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Consultants:<br\/>Laniz Consulting Engineers, Metrostroy (Russia), Amberg Engineering (Switzerland)<br\/>Supervisory Authorities:<br\/>Laniz Consulting Engineers, Amberg Engineering (Switzerland)<br\/>Project Technical Overview<br\/>Tunnel Length: 6,300 meters<br\/>Cross-Sectional Area: 21 m\u00b2<br\/>Excavation Method: Mechanized (TBM)      <\/p>\n\n<p class=\"wp-block-paragraph\">Scope of Services by Laniz \u2013 Alborz Exploratory Tunnel<br\/><br\/><\/p>\n\n<p class=\"wp-block-paragraph\">On-Site and Executive Supervision, including:<br\/>Site supervision<br\/>Tunnel supervision<br\/>Planning and execution methodology<br\/>Work progress monitoring<br\/>Engineering support<br\/>Task delegation and coordination<br\/>Interim handover procedures<br\/>Quality control<br\/>Cost estimation, payment verification, and contract management<br\/>Site Design Consulting:<br\/>Design of mechanized construction facilities<br\/>All supporting structures on site<br\/>Support for Metrostroy Contract:<br\/>Oversight and coordination of foreign experts<br\/>Geological reporting for tunnel sections<br\/>Documentation and archiving of technical records<\/p>\n\n<p class=\"wp-block-paragraph\">Main Alborz Tunnel Project<\/p>\n\n<p class=\"wp-block-paragraph\">Client: Tehran\u2013North Freeway Company<br\/>Project Manager: Abadgaran Margoon Co.<br\/>Initial Consultants: Laniz Consulting Engineers, Metrostroy (Russia)<br\/>Technical Consultant: Geodata<br\/>Supervisory Authority: Laniz Consulting Engineers<br\/>Contractors: General Mechanic Co. &amp; Talon Co.<br\/>Scope of Services by Laniz \u2013 Main Tunnel:      <\/p>\n\n<p class=\"wp-block-paragraph\">Project planning and method selection<br\/>Work progress monitoring<br\/>Engineering and technical consulting<br\/>Task delegation and execution oversight<br\/>Quality assurance<br\/>Financial auditing, contract review, and legal services<\/p>\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"featured_media":6033,"template":"","category-of-projects":[73],"class_list":["post-4882","projects","type-projects","status-publish","has-post-thumbnail","hentry","category-of-projects-tunneling"],"_links":{"self":[{"href":"https:\/\/lanizco.com\/en\/wp-json\/wp\/v2\/projects\/4882","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lanizco.com\/en\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/lanizco.com\/en\/wp-json\/wp\/v2\/types\/projects"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lanizco.com\/en\/wp-json\/wp\/v2\/media\/6033"}],"wp:attachment":[{"href":"https:\/\/lanizco.com\/en\/wp-json\/wp\/v2\/media?parent=4882"}],"wp:term":[{"taxonomy":"category-of-projects","embeddable":true,"href":"https:\/\/lanizco.com\/en\/wp-json\/wp\/v2\/category-of-projects?post=4882"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}